Skip to content

Read the dashboard

3 min read · Screen: / · Needs: Permissions.Dashboard.View

Choose an Environment (or all) and a period - 24 h or 7 d - at the top right. The figures refresh every minute, on Refresh, and when a run on the timeline ends.

Tile Shows
Successful · Failed Runs that ended that way in the period, and in the last 7 days.
Protected Servers with at least one enabled plan, out of all servers.
Storage used Bytes in your targets, against the quotas you set.
Next scheduled When the next scheduled run starts.
Success rate The share of runs that succeeded.

Job timeline

Recent runs and restores as they happen. Click one to open its console. All runs → opens backup history.

Actions

Run backup, Create backup plan, Register database, Test connection, Browse restore points.

Risks

Counts that should be zero - each links to where you fix it.

Storage and upcoming schedules

How full each target is, and what runs next.

Risk Means Go to
RPO breaches A plan has not succeeded within its RPO. Backup plans
Unreachable servers The reachability check cannot connect. Servers
Host-key mismatches A server answers with a different host key - operations are blocked. Servers
Credentials near rotation A credential’s rotation date is close. SSH credentials
Database backup failures, 24 h Database runs failed or were interrupted. Backup history
Corrupt or missing artifacts A check found a stored artifact changed or gone. Artifacts
Quiesce steps not undone A container paused or stopped for a backup was not started again. The run’s console
Plans not restore-ready A plan’s readiness score is low - its page shows which part is missing. Backup plans